A primary bath with a curbless shower
A dated primary bath became a warm, step-free room with a curbless shower and a freestanding tub.
Neighborhood
Queen Anne
Finished
2025
Budget
$60,000 to $75,000
Construction time
8 weeks

The project
The house
A 1920s house on Queen Anne Hill with a small primary bath and a step up into the shower.
The plan
Lower the shower floor between the joists for a curbless entry, and fit a tub under the window.
The build
We reframed the floor, waterproofed the whole room and set large-format tile with a linear drain.
The result
A bath that is easier to use now and later, with heated floors.
No step into the shower was the whole point, and it came out exactly as drawn.
David R.
Sample quote
During construction
Photos
How it turned out